上門評估是否收費?Is the site survey free?
評估是全免的。為你提供最準確的資訊及報價,讓你考慮清楚才作決定,放心交給我們吧!The assessment is completely free. We'll give you the most accurate picture and price we can, so you can think it through before deciding — leave it with us.
EMSD 註冊電業承辦商・全港上門EMSD registered contractor · all Hong Kong
村屋、獨立屋、私人屋苑、新建屋苑 —— 四種情況四個價錢,全部列在下面。免費上門評估,勘查後報價即為最終價,不會事後加價。Village houses, detached houses, private estates, new estates — four situations, four prices, all listed below. Free site survey, and the quote after it is the price.
按下按鈕會開啟 WhatsApp 並自動帶入你填的資料,確認後發送即可。Submitting opens WhatsApp with your details filled in — just press send.
安裝充電樁費用Installation pricing
以下為 Wall Case 3 連安裝的價錢。影響最終數字的是走線距離、電錶容量及走線方式,勘查後的報價即為最終價。Wall Case 3 including installation. What moves the final number is cable distance, meter capacity and routing method — and the quote after survey is final.
優惠價・2026年9月30日前落單Promo price — order before 30 Sep 2026
先分清楚你屬於哪一種Work out which you are
電力基礎已備妥,接駁最直接Infrastructure is in place — the most direct connection
睇詳細流程 →See the steps →唔使人批,但要等中電,約 2–3 個月No approvals needed, but CLP takes 2–3 months
睇詳細流程 →See the steps →有預留掣位,改裝成專用充電線路An outlet is already there — converted to a dedicated circuit
睇詳細流程 →See the steps →技術唔難,難在法團審批同走程序The engineering is easy; the committee is the work
睇詳細流程 →See the steps →實地相片,並非效果圖Real sites, not renders

戶外走線加設防水線槽,申請獨立電錶,7kW 單相。難處:電錶位於屋內,車位在屋外,需穿牆敷設 8 米外露走線。Outdoor conduit run, dedicated meter applied, 7kW single phase. The problem: meter indoors, bay outdoors, an 8m exposed run through the wall.

經法團審批,採用共用電錶方案,走線收納於天花線槽。業主自行申請三個月未果,我們接手兩星期內獲批。Committee approved, shared meter setup, cabling hidden in ceiling trunking. The owner tried for three months; we cleared it in two weeks.

位置完全露天,長期日曬雨淋。IP65 機身加裝防水遮罩,並獨立打設接地樁,經歷多場黑色暴雨後運作正常。Fully exposed to sun and rain. IP65 body plus a rain shield, with its own earth rod. Several black rainstorms later, no faults.
常見問題Common questions
評估是全免的。為你提供最準確的資訊及報價,讓你考慮清楚才作決定,放心交給我們吧!The assessment is completely free. We'll give you the most accurate picture and price we can, so you can think it through before deciding — leave it with us.
村屋無需審批,最快兩星期完成。屋苑須經管理處或法團通過,一般需時四至六星期,視乎他們何時開會。Village houses skip approval — as fast as two weeks. Estates need management or committee sign-off, usually four to six weeks depending on their meeting schedule.
可以,但須取得業主書面同意。我們可提供標準同意書範本,供你交予業主。Yes, with the owner's written consent. We can provide a standard consent form to pass to your landlord.
安裝工程一律設 2 年保養,期內因安裝問題引致的故障上門維修免費。機件方面:Wall Case 系列同設 2 年保養,非人為損壞可一換一;其他品牌充電樁的機件保養按原廠條款處理,我們會協助你辦理。The installation always carries two years, and faults caused by the install are repaired on site at no charge within that period. On hardware: the Wall Case series also carries two years with a one-for-one replacement for non-accidental faults. Other brands follow their manufacturer's terms, and we'll help you process a claim.
免費,亦沒有任何後續責任。我們寧願你在決定之前知道真實情況。Free, and you're under no obligation. We'd rather you knew the real situation before deciding.